Independent data-center intelligence · 558+ US projects graded

The credible grade for the data-center fight.

GridWatcher turns complex public records into an objective A–F transparency score for US data-center developments — so residents, local leaders, and journalists know what's really being proposed in their county.

Like a bond rating for data centers — every grade built from verified public records and a published, deterministic methodology.

Sample report card · real project

Every grade is sourced. None are faked.

A live example from our index. Where a project discloses nothing on a pillar, we mark it Insufficient Disclosure — we never invent a number to fill the gap. That discipline is the whole point.

PRINCE WILLIAM COUNTY, VA · METHODOLOGY v2.5.0

Microsoft Azure Gainesville Tech Park

Transparency gradescore 71.6 / 100
C
Grid strain58
Energy74
WaterInsufficient Disclosure
Economic82
Environment76
Governance85
JobsInsufficient Disclosure
SovereigntyInsufficient Disclosure
Sources: EPA · VA DEQ air permits · Prince William County planning · Dominion / PJM grid context Get access to the full index →

Grid is a statewide strain context (VA / PJM · Dominion), not a per-project measurement. Energy reflects a VA DEQ air-permit disclosure proxy, not a measured megawatt figure.

Methodology

Ingest → grade → act.

We pull every public source for every state, grade only what's actually disclosed, and publish the letter with its receipts. Opacity is a grade, never a gap to fake.

A
AExemplary disclosure
B
BHigh transparency
C
CModerate gaps
D
DHigh opacity
F
FTotal opacity
GRID · heaviest weight

Grid & energy strain

Interconnection queues, utility load context, and onsite generation permits — how much the project leans on the public grid.

WATER & ENVIRONMENT

Water & environmental footprint

Cooling water draw, watershed stress, and air/emissions permits from EPA and state environmental agencies.

ECONOMIC & GOVERNANCE

Subsidies & public process

Tax abatements, NDAs, rezoning transparency, and how open the public hearing and disclosure process actually was.

THE KNOCKOUT RULE

Thin data can't earn an A

An opacity cap holds down any project that discloses little — a low grade is a verdict on disclosure, not a slur on the project.

Civic guides

Turn the fight into facts.

Free, practical walk-throughs — whether you're a resident who just saw a rezoning notice or a leader preparing for a hearing.

Who it's for

Built for everyone at the table.

Residents & communities

  • Is a data center coming to my town?
  • Water, noise & property impact
  • What to ask before the vote

Leaders & officials

  • Model ordinances & benchmarks
  • Tax-abatement trade-offs
  • Rezoning best practices

Journalists & researchers

  • Sourced, per-project datasets
  • NDA & subsidy transparency
  • State-by-state comparisons

Independent by design

A grade is only worth what its independence guarantees. GridWatcher’s scoring is driven entirely by public records and a published methodology — a developer can pay for a subscription, but never for a better grade.

  • Grades can’t be bought. No developer can sponsor, influence, or edit its own score — ever.
  • Public-record citations. Every score links to a verifiable government document.
  • Deterministic scoring. Grades come from an open, published methodology — non-partisan, data-first.
Early access

Get verified data before the zoning vote.

We're indexing public records across every major US data-center corridor. Apply to join the early-access review list — we prioritize county rollout by where the need is greatest.

EARLY ACCESS APPLICATION
We check data-center filings in your county.
Application received & queued for review

Thank you. We're matching your county against our indexed projects and will reach out by email once your area's data and platform access are ready.